Durable floors Cidemat

Lost formwork for the production of sewer manholes

It is a CETRIS cement-bonded board, which is used as a lost formwork of shaft bottom from an inner diameter of 1000 mm up to 1600 mm. The board is adapted for different mounting into the mould - the modification is made according to customers - different materials - see photo.

Lost formwork for the production of sewerage shafts
Lost formwork for the production of sewerage shafts